Project Phoenix started out of a frustration with the disappointing results achieved with Moondog of Jersey the ex quarter tonner. Given Moondog's extreme IOR style the CHS and IRC rules seemed to give a rating that was difficult to race to. The search then started for a hull design to make use of Moondog's sails and fittings. A number of designers were approached however given the cost of a one off design the discovery of Dudley Dix's stock designs on the web seems to give an appropriate solution. Light weight, similar rig, sportsboat style with asymmetric downwind sails, allied to a lifting keel all seemed appropriate for our type of sailing and build budget. The hope with the Didi 26 design is for fun sailing at much greater speed than the quarter tonner gives. Whether we achieve any better race results remains to be seen! The lifting keel will also make launching and recovery once a year a real low budget affair, not to mention ease of midseason scrub. Building started in March 2004 after the arrival of all the timber. The hope is to have the new design racing in 2005. I will update the story as the build progresses and will keep a log of time spent and expenditure. This could be a route for others with modern sails on old quarter tonner hulls to get some fun back by building an inexpensive new hull. |
||
| January 2005 | Bulhead Repairs May 2006 | |
| April 2005 | ||
| Winter 05/06 | ||
![]() |
![]() |
![]() |
| Purchase Of Wood Materials | Rudder Cut Outs Ready For Gluing | Keel & Keel Box Construction |
![]() |
![]() |
|
| Bulkhead Construction | Bulkhead Construction | Rear Bulkhead Construction |
![]() |
![]() |
![]() |
| Hull Construction Frame | Hull Construction Tent | Front Bulkheads In Place |
![]() |
![]() |
![]() |
| Front Bulkheads In Place | Keel Box In Place | All Bulkheads In Place |
![]() |
![]() |
![]() |
| Stringers Glued In | Bulkhead Correction | Outer Stringers In Place |
![]() |
![]() |
![]() |
| Outer Stringers In Place | Cockpit Floor Fitted | Cockpit Sides & Floor Fitted |
![]() |
![]() |
|
| Sheer Clamps Fitted | Transom In Place | Upper Side Panels Fitted |
|
|
|
|
| Bow Preparation For Panel Fitting | Bow Panels Fitted | Rear Bottom Panels Fitted |
![]() |
|
|
| First Layer Of Radius Chines | First Layer Complete | Second Layer In Progress |
![]() |
![]() |
|
| Epoxy Coating Hull | Full Rub Down | First Undercoat |
|
|
|
|
| New Cradle Completed | Rolling Hull Over | Rolling Hull Over |
|
|
![]() |
|
| Rolling Hull Over | Boat Lifted Onto Cradle | Boat Lifted Onto Cradle |
|
|
|
![]() |
| New APR 90 | Cool Box Construction | Epoxy Coating Interior |
|
|
|
|
| Epoxy Coating Interior | Filleting Rear Panels | Internal Construction |
|
|
|
|
| Filleting Rear Panels | Rear Panel Fillets Complete | Galley Construction |
|
|
|
|
| Epoxying Front Panels | Backbone Reinforcement | Cabin End In Place |
|
|
|
|
| Epoxy Coating Completed | Forward Deck Stringers | Fitting Bunk Fronts |
![]() |
![]() |
![]() |
| Fitting Fore Deck | Fitting Side Decks | Fitting Side Decks |
|
|
|
|
| Fitting Bunk Fronts | Fitting Side Decks | Fitting Coach Roof Panels |
![]() |
|
|
| Taping Coach Roof Seams | Fore Hatch & Window Cut Outs | Mast Support |
|
|
|
|
| Taping Internal Seams | Fitting Chain Plates | Sheer Clamp Capping |
![]() |
![]() |
![]() |
| Fitting Seacocks In Heads | Fitting Hatch Slides | Log And Depth Sounder Installed |
|
|
|
|
| Fitting Floor Board Supports | Fitting Floorboards | Bow Capping Piece |
|
|
![]() |
|
| Hatch Fittings | Fitting Mast Step | Fitting Door Frame In Heads |
![]() |
|
|
| Epoxy Coating Deck | Fitting Bowsprit Traveller | Undercoating Centre Cabin |
|
|
|
![]() |
| Fitting Rear Deck Stringers | Fitting Rear Decks | Fitting Toe Rail |
![]() |
![]() |
![]() |
| Aft Corner Stanchions | Tidying Transom / Aft Deck | Re-Worked Pulpit |
![]() |
![]() |
|
| Building Keel Bulb Plug | Building Keel Bulb Plug | Painting Cabin Interior |
|
|
|
|
| Painting Cabin Interior | Fitting New Spreaders | Trial Mast Lift |
|
|
|
|
| Trial Mast Lift | Galley Fitted | Epoxy coating Rear Decks |
|
|
|
|
| Top Coat On Coach Roof | Varnishing Transom | First Top Coat On Hull |
|
|
|
|
| First Top Coat On Decks | Instruments Fitted | Antifouling |
|
|
|
|
| Keel Bulb Delivered | Switch Panels & GPS Fitted | Rear Berth Tops Fitted |
|
|
|
|
| Bilge Pumps Fitted | Pullpit Fitted | Fitting Deck Gear |
|
|
|
|
| Fitting Keel Bulb | Fitting Keel Bulb | Fitting Keel Bulb |
|
|
|
|
| Applying Logo | Applying Boat Name | Non Slip Decks Patches |
|
|
|
|
| Ready For Trailing | Launching Moondog | Christening |
|
|
|
![]() |
| Launching Moondog | Launching Moondog | On Mooring |